- Products
- Floating fenders
- Fixed fender solutions
- Floating hose equipment
- Deck equipment
- Quayside equipment
- Marine anchors, chain and rope
- Marine hooks
- HALO maritime products
- Surface and sub-surface buoyancy
- Services
- CALM buoy services
- Floating hose services
- Fuels infrastructure services
- Marine design and consultancy services
- Subsea services
- Terminal management services
- Yokohama pneumatic floating fenders
- Floating foam fenders
- Naval lightweight grey fenders
- Pneumatic floating submarine fenders
- Fender hire
- Arch fixed fenders
- Leg fenders
- Fender davits
- Multi-purpose fenders
- Vessel fendering systems
- Bespoke fenders
- High holding power anchors
- Offshore mooring anchors
- Standard holding power anchors
- Marine rope
- Stud link chain and fittings
- Towtectors protective sleeves
- Wire carpenter stoppers
- Fortress Automatic Gate Control (AGC)
- Guardian Retractable Defence Barrier (RDB)
- Orion Retractable Defence Barrier (RDB)
- Orion Deployer RDB
- Orca Line of Demarcation (LOD)
- Sentinel Strategic Defence Barrier (SDB)
- Triton Static Defence Barrier (SDB)
- Mooring buoys
- Navigation buoys
- Offshore buoys
- Sub-surface buoys
- Open link chain fittings and sinkers
- Fendercare Marine expands service offerings with bespoke fixed fendering solutions
- Fendercare Marine successfully completes Bay of Gibraltar LNG STS operation
- Fendercare Asia Pacific expands operational base with a move to new premises
- Straits Energy Resources unit signs HOA with Fendercare Marine
- Archive
NuStar Caribbean terminals receiving equipment and training
In 2014, Fendercare Marine provided Pilotage support to the NuStar Energy LP terminals operating on the island of St. Eustatius in the Caribbean.
Services provided
- Berthing at CALM Buoys with attendance during cargo operations
- Berthing and unberthing alongside the conventional berths with tug assistance
- Continuous monitoring of load/discharge operations of vessels berthed at the CALM Buoy
- Instructing tugs and line boats during ship docking activities
- Training new marine Pilots and Mooring Masters
- Provided anchorage position instructions for vessels receiving bunkers and port information/movements to Vessel Masters
Benefits delivered
- Documentation for ship arrival/departure maintained for all vessels using terminal facilities
- All marine related regulations and vessel documentation updated and adhered to
- All HSQE safe working practices of Marine employees and contractors were enforced and developed
- Fendercare Marine Pilotage team acted as the terminal representative on arriving vessels to provide focal point of contact